GEKO secured vendor qualification for LG Innotek’s new $1 billion semiconductor substrate factory in Hai Phong, Vietnam, supplying high-purity ball valves & butterfly valves for UPW, chemical & utility piping systems.
Project Overview
LG Innotek, a subsidiary of LG Group, invested approximately $1 billion to build its first overseas advanced semiconductor substrate manufacturing base in the DEEP C Industrial Zone, Hai Phong, Vietnam. The plant covers 330,000 ㎡ and focuses on FC-BGA, FC-CSP and RF-SiP substrates, serving AI chips, data center and 6G communication hardware. Construction kicked off in Q3 2026, with trial production scheduled in late 2027.
Semiconductor substrate fabrication sets ultra-strict requirements for fluid control: zero particle shedding, low metal ion leaching, stable sealing against corrosive wet chemicals and consistent performance for ultrapure water (UPW) and plant utility loops. After a multi-round technical audit, sample testing and factory review, GEKO Valve successfully passed vendor qualification and was shortlisted for the project’s valve supply scope.
Project Challenges
Ultra-high purity requirement: Wetted components must comply with SEMI F57 standard, controlled at ppt-level contamination to avoid wafer yield loss.
Multi-medium working conditions: Mixed media including UPW, etching & cleaning chemicals, compressed dry air and cooling water.
Long-term stable tight shut-off: Micro-leakage is unacceptable for clean process loops inside Class 100 cleanrooms.
Localized after-sales support: LG’s Vietnam site required fast on-site technical service and inventory coordination in Southeast Asia.
GEKO Customized Solution
For this LG Vietnam semiconductor substrate project, GEKO proposed a matched valve package:
High-purity 316L electropolished ball valves: Ra ≤0.25μm, PTFE sealing, for ultrapure water and clean process gas distribution
PFA-lined butterfly valves: Excellent resistance to strong acid, alkali and oxidizing wet chemicals for chemical distribution skids
Pneumatic actuated automated valves: With certified positioners and limit switches, integrated into the factory’s central DCS control system
Full documentation traceability: Material test reports, EP surface inspection, particle & extractable test certificates, clean-room packaging
GEKO leveraged its Southeast Asia service network to provide local technical support, pre-shipment clean packaging and commissioning guidance, meeting LG’s global semiconductor procurement specification.
Why LG Selected GEKO
Proven track record on high-tech, clean fluid projects across Vietnam and Singapore
Strict quality control aligned with SEMI, ASME BPE international semiconductor standards
Flexible material options: EP 316L, PFA lining, high-purity PTFE/Viton sealing for different process loops
Complete local support channel in Vietnam, shortening lead time and response cycle
Stable zero-leak performance, low particle release to protect substrate production yield
Summary
Shortlisting for LG Innotek’s Vietnam semiconductor substrate project marks a key milestone for GEKO Valve in the global semiconductor fluid control market. GEKO will continue to optimize high-purity valve portfolio for wafer, substrate and packaging fabs, supporting semiconductor manufacturing expansion across Southeast Asia.